CTA Standards: Difference between revisions
Jump to navigation
Jump to search
m (Category:CTA) |
|||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
Creative will get a server reset sometime in March. When that happens, CTA will need to rebuild. That gives a change to standardize the rail styles. | Creative will get a server reset sometime in March. When that happens, CTA will need to rebuild. That gives a change to standardize the rail styles. | ||
== Proposals == | |||
<gallery> | |||
File:CTA Proposed Track Under Ground.png|Standard subway track | |||
File:CTA Proposed Track Above Ground.png|Standard above ground track (only difference is light is in the iron) | |||
File:CTA Proposed Booster.png|Booster, every so often | |||
File:CTA Proposed Terminal Station.png|"Perfect Station" on map Revision 11. Should become the standard for one-rail terminals, with the color trim along the wall (like the rest of the track) | |||
File:CTA Proposed Incoming Station.png|Incoming station | |||
File:CTA Proposed Outgoing Station.png|Outgoing station | |||
For stations (as opposed to terminals), the terminal station would just be mirrored over itself so it becomes 2 ways. All stations should stop. | |||
</gallery> | |||
[[Category:CTA]] |
Latest revision as of 20:10, 12 February 2012
Creative will get a server reset sometime in March. When that happens, CTA will need to rebuild. That gives a change to standardize the rail styles.
Proposals
- For stations (as opposed to terminals), the terminal station would just be mirrored over itself so it becomes 2 ways. All stations should stop.