Orange Line: Difference between revisions
Jump to navigation
Jump to search
Cutcontent (talk | contribs) No edit summary |
Cutcontent (talk | contribs) No edit summary |
||
Line 15: | Line 15: | ||
=== Protest === | === Protest === | ||
On one of the corners of the Orange Line a protest against CTA was done. | On one of the corners of the Orange Line a protest against CTA was done. Someone attempted to stop construction of the line by putting random stuff in its way. CTA found a loophole, quite literally, ''around'' it. | ||
Shields have been placed protecting the railroad. | |||
== Statistics == | == Statistics == |
Revision as of 18:24, 11 February 2022
Orange Line | |
Runs | Northwest-Northeast |
Primary Hubs | |
Stations |
Orange Line is a Creative Transit Authority rail line in the Creative server revision 35. It runs from Yellow Interchange to Speedbuild Station. It is the newest line on the CTA.
About
The rails on the Orange Line are built from Acacia Wood, Red Sandstone and Orange Concrete.
Protest
On one of the corners of the Orange Line a protest against CTA was done. Someone attempted to stop construction of the line by putting random stuff in its way. CTA found a loophole, quite literally, around it.
Shields have been placed protecting the railroad.
Statistics
- Hubs: 0
- Stations: 2
- Transfer Stations: Yellow Interchange
- Construction started: MM/DD/YY
- Construction ended: MM/DD/YY
- Nearby landmarks: NEVAco Spleef Stadium
|
|