Purple Line: Difference between revisions
Jump to navigation
Jump to search
(Replaced content with " - Team aVolition Deserves Icecream") |
m (Reverted edits by 81.137.62.5 (talk) to last revision by QuidProQuo) |
||
Line 1: | Line 1: | ||
{{Infobox Line | |||
|name = Purple Line | |||
|color = #BB00BB | |||
|runs = Around [[New Reddit City]] | |||
|hubs = [[Goron Station]] in [[Goron Tower]] | |||
|stations = Coastline Station | |||
}} | |||
'''Purple Line''' is a rail that encircles the area of [[New Reddit City]]. It is a loop, so one can ride on it forever. The ''de facto'' start and end point is the hub at [[Goron Station]]. It goes from downtown NRC all the way out to the [[Highlands]], and stops at various points across the city. | |||
'''Statistics''' | |||
*Six stations, one main line | |||
** [[Coastline station]] | |||
** [[Goron Station]] | |||
** [[Stockholm Station]] | |||
** [[Airport Station]] | |||
** [[Highland Station]] | |||
** [[Stadium Station]] | |||
*Construction: Completed sometime around the 26th of January 2011 | |||
*Length: Approximately 1200 blocks. | |||
*Travel time: -needs to be measured- | |||
*Number of boosters: -needs to be counted- | |||
*Connects to: [[Blue Line]] and [[Cyan Line]] at Goron Tower, [[Pink Line]] at [[Coastline Station]] | |||
'''How To Find Purple Line''' | |||
Follow the Blue Line under the spawn to CTA tower, and continue along Blue Line to Goron Tower. | |||
'''Future plans''' | |||
There are no current further construction plans for the line. | |||
{{Creative Transit Authority}} |
Latest revision as of 16:58, 5 April 2011
Runs | Around New Reddit City |
---|---|
Primary Hubs | Goron Station in Goron Tower |
Notable Stations | Coastline Station |
Purple Line is a rail that encircles the area of New Reddit City. It is a loop, so one can ride on it forever. The de facto start and end point is the hub at Goron Station. It goes from downtown NRC all the way out to the Highlands, and stops at various points across the city.
Statistics
- Six stations, one main line
- Construction: Completed sometime around the 26th of January 2011
- Length: Approximately 1200 blocks.
- Travel time: -needs to be measured-
- Number of boosters: -needs to be counted-
- Connects to: Blue Line and Cyan Line at Goron Tower, Pink Line at Coastline Station
How To Find Purple Line
Follow the Blue Line under the spawn to CTA tower, and continue along Blue Line to Goron Tower.
Future plans
There are no current further construction plans for the line.
|