Avalon Station: Difference between revisions

From MC Public Wiki
Jump to navigation Jump to search
No edit summary
Line 13: Line 13:
'''Avalon Station''' is a [[Metro Rail]] midway-bypass station on the [[Iron Line]], between the [[industrial warp point]] and the [[7-segment display]]. Its stop designator is <span style="font-family: monospace">/st avalon</span>.
'''Avalon Station''' is a [[Metro Rail]] midway-bypass station on the [[Iron Line]], between the [[industrial warp point]] and the [[7-segment display]]. Its stop designator is <span style="font-family: monospace">/st avalon</span>.


REDDIT SUCKS!!!! SUPPORT AVO!!!
== Destinations ==
 
As a midway-bypass station, Avalon lies between two designated hub locations, neither of which have been constructed yet. Heading south, the first station from Avalon is [[Industrial Station]]. To the north is [[7segment Station]] and the end of the [[Iron Line]].
 
== Construction ==
 
[[Image:Avalon_exterior.png|thumb|right|The exterior of the station.]]
 
Avalon was built as an example of a minimal midway-bypass station for the [[Metro Rail]] by [[User:klange|klange]] starting at the end of December 2010. Its final construction was completed 4 January 2011. Avalon features empty cart removal and smooth track forks and merges.
 
{{Metro Rail}}
{{Metro Rail Iron}}
[[Category:Creative Creations]]

Revision as of 04:23, 31 May 2011

Avalon Station
Avalon interior.png
      Iron Line
IndustrialAvalon Station7segment
Designator /st avalon
Coordinates X: -1345 Z: 16


Avalon Station is a Metro Rail midway-bypass station on the Iron Line, between the industrial warp point and the 7-segment display. Its stop designator is /st avalon.

Destinations

As a midway-bypass station, Avalon lies between two designated hub locations, neither of which have been constructed yet. Heading south, the first station from Avalon is Industrial Station. To the north is 7segment Station and the end of the Iron Line.

Construction

The exterior of the station.

Avalon was built as an example of a minimal midway-bypass station for the Metro Rail by klange starting at the end of December 2010. Its final construction was completed 4 January 2011. Avalon features empty cart removal and smooth track forks and merges.