Yellow Line: Difference between revisions

From MC Public Wiki
Jump to navigation Jump to search
(Created page with "{{Infobox Line |name = Yellow Line |color = #FFFF00 |runs = Spawn - Fukasaku Gardens |hubs = New Spawn Station |stations = Rapture Station }} '''Yellow Line''...")
 
No edit summary
 
(18 intermediate revisions by 9 users not shown)
Line 1: Line 1:
{{Infobox Line
{{Infobox Line2
|name     = Yellow Line
| name                 = Yellow Line
|color   = #FFFF00
| color                 = Gold
|runs     = Spawn - Fukasaku Gardens
| runs                   = North-South
|hubs     = [[New Spawn Station]]
| image                = CTA Yellow Line 17.png
|stations = Rapture Station
| image_size      = 275
| image_caption = Entrance to Yellow Line at [[Spawn Station]]
| hubs                 = [[Spawn Station]]
| stations             = [[Beyond]], [[Spleef Station]], [[CTA HQ-Winchester]]
                               
 
}}
}}


'''Yellow Line''' was built to extend player access to the more remote Northern parts of the server.  It is one of the longest lines, and contains one of the greatest distances between stops - from [[Rapture]] to Fukasaku Gardens. It serves as a fast connection from [[Creative Spawn]] to Rapture and Walmart, and then runs parallel to the Eastern Rapture Bypass out to the remote properties of Fukasaku Gardens, The Temple of the Old Ones and the Benedictine Mission of Minecraftia.
'''Yellow Line''' is a [[Creative Transit Authority]] rail line in the [[Creative]] server revision 35. It runs from [[Spawn Station]] to the northern end of the map. It is one of the 4 cardinal CTA lines, running due north from Spawn.  
 
Rapture Station is right next to the Local Rapid Transit System's Cyan Line (not managed by the [[Creative Transit Authority]]), which connects Rapture and Rubik's Cube Apartments centrally to Walmart.
 
'''Statistics'''
 
*Four stations, one main line
 
*Construction: In two phases, the first completed on the 23rd of January 2011, the second on the 26th of January 2011
 
*Length: -needs to be measured-
 
*Travel time: -needs to be measured-
 
*Number of boosters: -needs to be counted-
 
*Connects to: Blue, Red and Green line at Spawn Central, Cyan LRTS Line at Rapture Station
 
'''How To Find Yellow Line'''
 
Main station at the Spawn point is located just south of the central square. It is easily visible and there's an immediate sign right in front of Spawn pointing the direction.
 
Rapture Station lies along the Yellow Road just near Rapture, and at the start of the Eastern Rapture Bypass located just south of Walmart.
 
Fukasaku Station is easily visible, and lies along the Northern Yellow Road next to the Japanese replica town of Fukasaku Gardens.
 
'''Interesting Structures Along The Line'''


The line passes goes past the underwater city of Rapture and also past a large Walmart.  It heads underground for a while and emerges near the City of Gold.  It then passes the Rubik's Cube Apartments on the east side.
== Statistics ==


'''Future plans'''
* Hubs: 1
* Stations: 1
* Transfer Stations: None
* Construction started: 2/1/2020
* Construction ended: 4/2/2020
* Nearby landmarks: None[[Media:[[Media:Example.ogg]]]]


There are no current further construction plans for the line.
== Images ==


<gallery>
File:CTA Yellow Line 17-1.png|Line going underground to Spawn
File:CTA Yellow Line 17-2.png|Tunnel to [[Spawn Station]]
File:CTA Yellow Line 17-3.png|Most of the line
</gallery>
NOTE: For Rev 17 Yellow Line, go to [[Yellow Line (Old)]]
{{CTA Yellow Line}}
{{Creative Transit Authority}}
{{Creative Transit Authority}}

Latest revision as of 19:10, 19 May 2020

Yellow Line
CTA Yellow Line 17.png
Entrance to Yellow Line at Spawn Station
Runs North-South
Primary Hubs Spawn Station
Stations Beyond, Spleef Station, CTA HQ-Winchester

Yellow Line is a Creative Transit Authority rail line in the Creative server revision 35. It runs from Spawn Station to the northern end of the map. It is one of the 4 cardinal CTA lines, running due north from Spawn.

Statistics

  • Hubs: 1
  • Stations: 1
  • Transfer Stations: None
  • Construction started: 2/1/2020
  • Construction ended: 4/2/2020
  • Nearby landmarks: None[[Media:Media:Example.ogg]]

Images

NOTE: For Rev 17 Yellow Line, go to Yellow Line (Old)