Überproject: Difference between revisions
Mattgorecki (talk | contribs) |
mNo edit summary |
||
(25 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
The '''Überproject''' is a collaborative megastructure that seeks to raise the bar of what can be done in survival smp. | |||
== Überproject Rev20 == | |||
{{Creation | {{Creation | ||
| title = Überproject | | title = Überproject Rev20 | ||
| image = | | image = [[File:Uber-rev20-5.png|250px]] | ||
| caption = | | caption = The Scarab Hall | ||
| server = [[PvE]] | |||
| map revision = 20 | |||
| coordinates = -1999, 2398 | |||
| lead = [[schererererer]] | |||
| contributors = Norami, [[Zomise]], drtednelson, [[totemo]], kumquatmay, BobDole, [[buzzie71]], 32ndFlava, Mrloud15, Australican, Aharit, Reon27, Andromeda4210, AnSq, mattgorecki, [[sansapants]], Eridani, and the City of Pico | |||
| started = May 2017 | |||
| completed = September 2017 | |||
}} | |||
The centerpiece of this Überproject is an approximately 401x401 pyramid of sandstone stairs and rises to the maximum sky limit height of 256. The structure is so big that even when flying around with elytra, chunks unloaded too fast to get a good screenshot of the whole pyramid. The interior included impressive designs such an extravagant giant scarab wall, great halls, temple chambers and ominous tombs. The Entrance Arch to the Great Pyramid was designed and constructed by mattgorecki. Its total height is approximately 50 blocks. | |||
Rough estimate of total resources used: 180000 sandstone stairs, 73000 sandstone, 36000 sandstone slabs, 17000 red sandstone, 13000 red sandstone slabs, 7000 red sandstone stairs, 5000 glass panes, 4000 hardened clay, 4000 glowstone, 3000 stone buttons, 2500 wool, 1800 coal blocks, 1500 torches, 1500 gold blocks, 1300 wool carpet, 1000 lapis blocks, 1000 water buckets, 650 wood buttons, 500 redstone blocks, 150 emerald blocks, 150 redstone lamps, 200 glazed terracotta blocks, and 80 diamond blocks. | |||
:''See the [https://www.reddit.com/r/mcpublic/comments/70d0hg/the_revision_20_%C3%BCberproject_is_finished_a_big/?ref=share&ref_source=link|related subreddit post] for more.'' | |||
[[File:Uber-rev20-4.png|350px|alt=Alt text|]] [[File:Uber-rev20-6.png|350px|alt=Alt text|]] [[File:Uber-rev20-7.png|350px|alt=Alt text|]] [[File:Uber-rev20-8.png|350px|alt=Alt text|]] | |||
=== Progression === | |||
<gallery perrow="4"> | |||
Image:Uber-rev20-2.png| | |||
Image:Uber-rev20-3.png| | |||
Image:Uber-rev20-1.png| | |||
</gallery> | |||
== Überproject Rev6 == | |||
{{Creation | |||
| title = Überproject Rev6 | |||
| image = [[File:Uberproject-2012-01-28 18.21.49.png|250px|Pillars]] | |||
| caption = Construction of the Hall of Pillars | |||
| server = [[PvE]] | | server = [[PvE]] | ||
| map revision = 6 | | map revision = 6 | ||
| coordinates = 1500, 2250 | | coordinates = 1500, 2250 | ||
| lead = schererererer | | lead = [[schererererer]] | ||
| contributors = frewpp, jack223, | | contributors = [[Bluemanze]], [[gunther3737]], [[dubloe7]], [[mattgorecki]], [[marting11]], [[shorelines]], [[frewpp]], [[Wilbur1340]], [[jack223]], [[A_Chilean_Miner]], [[kreiger_c]], [[purine]], [[Player:bencvt|bencvt]], and many more | ||
| started = | | started = early January | ||
| completed = | | completed = 14 Feb 2012 | ||
}} | }} | ||
The | The first Überproject was inspired by the halls of Moria and such works as [[Dome5]]. This project brought the server together to create something incredible. For directions, please see a rail map of the server, accessible via the PvE Atlas. Near the dig site are public farms including wheat and tree farms. There are direct lines from [[New Argoth]], [[Lothos]], and [[Nowhere]]. The nearest portal is at [[Nowhere]]. | ||
Near the dig site | |||
== | [[File:Uberproject-rev6-1.jpg|350px|alt=Alt text|]] [[File:Uberproject-rev6-2.jpg|350px|alt=Alt text|]] [[File:Uberproject-rev6-4.png|350px|alt=Alt text|]] [[File:Uberproject-rev6-3.jpg|350px|alt=Alt text|]] | ||
=== Progression === | |||
On January 16, digging proceeds, scaffolds are constructed. A base camp is built up organically. Between January 20 and January 23 digging continues, additional scaffolds are constructed, and the first three pillars completed. Fourth and fifth pillars started. On January 26, digging effectively complete. On January 28, many more pillars were completed and fountains added. Sea level construction started. | |||
<gallery perrow="4"> | |||
Image:Uber2012-01-16 20.24.29.png|2012-01-16 | |||
Image:Uber2012-01-16 20.24.38.png|2012-01-16 | |||
Image:PvE uberproject 2012-01-20 22.46.00.png|2012-01-20 | |||
Image:PvE Uberproject 2012-01-20 23.05.19.png|2012-01-20 | |||
Image:2012-01-21_12.29.29.png|2012-01-21 | |||
Image:UP1.png|2012-01-22 | |||
Image:UPx2.png|2012-01-23 | |||
Image:UP3.png|2012-01-23 | |||
Image:Uber2012-01-26 08.34.36.png|2012-01-26 | |||
Image:Uber2012-01-26 08.35.00.png|2012-01-26 | |||
Image:Uber2012-01-26 08.35.10.png|2012-01-26 | |||
Image:HoP1.png|2012-01-28 | |||
Image:HoP2.png|2012-01-28 | |||
Image:Entry.png|2012-01-28 | |||
Image:Uberproject-2012-01-28 18.21.49.png|2012-01-28 | |||
</gallery> | |||
=== | === Diggers === | ||
[[File: | [[File:Uberproject-diggers-2012-01-26 19.12.png|thumb|left|800px|Hall of fame as 23th January 2012.]] | ||
[[File:Uberproject-diggers-2012-01-27 19.23.43.png|thumb|left|800px|Hall of fame as 26th January 2012.]] | |||
[[Category:Uberproject]] | |||
[[Category:PvE_creations_(map_revision_20)]] | |||
{{PvE Atlas r6}} | {{PvE Atlas r6}} |
Latest revision as of 00:13, 2 January 2019
The Überproject is a collaborative megastructure that seeks to raise the bar of what can be done in survival smp.
Überproject Rev20
The Scarab Hall | |
Location | |
---|---|
Server | PvE |
Map revision | 20 |
Coordinates | -1999, 2398 |
Creators | |
Lead | schererererer |
Contributors | Norami, Zomise, drtednelson, totemo, kumquatmay, BobDole, buzzie71, 32ndFlava, Mrloud15, Australican, Aharit, Reon27, Andromeda4210, AnSq, mattgorecki, sansapants, Eridani, and the City of Pico |
Timeline | |
Started | May 2017 |
Completed | September 2017 |
The centerpiece of this Überproject is an approximately 401x401 pyramid of sandstone stairs and rises to the maximum sky limit height of 256. The structure is so big that even when flying around with elytra, chunks unloaded too fast to get a good screenshot of the whole pyramid. The interior included impressive designs such an extravagant giant scarab wall, great halls, temple chambers and ominous tombs. The Entrance Arch to the Great Pyramid was designed and constructed by mattgorecki. Its total height is approximately 50 blocks.
Rough estimate of total resources used: 180000 sandstone stairs, 73000 sandstone, 36000 sandstone slabs, 17000 red sandstone, 13000 red sandstone slabs, 7000 red sandstone stairs, 5000 glass panes, 4000 hardened clay, 4000 glowstone, 3000 stone buttons, 2500 wool, 1800 coal blocks, 1500 torches, 1500 gold blocks, 1300 wool carpet, 1000 lapis blocks, 1000 water buckets, 650 wood buttons, 500 redstone blocks, 150 emerald blocks, 150 redstone lamps, 200 glazed terracotta blocks, and 80 diamond blocks.
- See the subreddit post for more.
Progression
Überproject Rev6
Construction of the Hall of Pillars | |
Location | |
---|---|
Server | PvE |
Map revision | 6 |
Coordinates | 1500, 2250 |
Creators | |
Lead | schererererer |
Contributors | Bluemanze, gunther3737, dubloe7, mattgorecki, marting11, shorelines, frewpp, Wilbur1340, jack223, A_Chilean_Miner, kreiger_c, purine, bencvt, and many more |
Timeline | |
Started | early January |
Completed | 14 Feb 2012 |
The first Überproject was inspired by the halls of Moria and such works as Dome5. This project brought the server together to create something incredible. For directions, please see a rail map of the server, accessible via the PvE Atlas. Near the dig site are public farms including wheat and tree farms. There are direct lines from New Argoth, Lothos, and Nowhere. The nearest portal is at Nowhere.
Progression
On January 16, digging proceeds, scaffolds are constructed. A base camp is built up organically. Between January 20 and January 23 digging continues, additional scaffolds are constructed, and the first three pillars completed. Fourth and fifth pillars started. On January 26, digging effectively complete. On January 28, many more pillars were completed and fountains added. Sea level construction started.
Diggers